无遮无挡三级动态图,国产欧美日韩精品A在线观看,国产成人无码视频一区二区三区三级,人伦片无码中文字幕

News
Home > News > Article
News
The project manager and chief engineer of Guangzhou he Expressway
DATE:2014-7-21   VISITORS:1826

March 8, 2006, the Guangzhou highway project manager and engineers to the Department of field inspection. During the period of our production process and product quality to give a high evaluation and recognition, but also to the Division I made a lot of really useful suggestions and requirements. The two sides sincere exchange of views in a very harmonious atmosphere, expressed a very optimistic expectation for future cooperation between the two sides.

Company leadership and technical staff to the wide he high speed engineer introduction to our cylindrical mold production process

Wide he high speed Engineer for our products to carry out careful inspection

The wide and he high speed engineer to the division of the actual measurement

Company leaders and technicians to the wide he high speed engineers introduced me to the Department of cylindrical mold production in some of the details

Company leaders and technicians to Guanghe highway engineer of our T beam steel mold production mode correction link

The wide he high speed engineer to our cylindrical mold production of some aspects of the problem of good suggestions and requirements

CONTACT US

0754-88224225

COMPANY ADDRESS: SHANTOU CITY, CHAOYANG JINYUAN INDUSTRIAL ZONE JINPING DISTRICT ROAD AREA 2M1
CHENESE DOMAIN NAME 1: China steel structure. | CHENESE DOMAIN NAME 2: China steel template.
TEL: 0754-88224225、88110777 | FAX: 0754-88110388 | EMAIL: 763737473@qq.com